Teulon-Hunter Memorial Hospital provides acute care, diagnostic imaging and lab services, outpatient care, ambulance and emergency medical services, occupational therapy, palliative care, physiotherapy and rehabilitation services, and spiritual care. The facility has 20 personal care and 16 hospital beds.

Authorized Dealer Tri-Star Automation installed a Reliable Controls building automation system during a retrofit of Teulon-Hunter Memorial Hospital.

Existing pneumatic controls needed to remain operational during the installation, so Tri-Star Automation interlocked them with the new building automation system. With Reliable Controls, facility operators gained improved control of the facility and the ability to identify mechanical equipment in need of repair or replacement.

The networked hardware included a dial-up modem, four air-handling units, makeup air units, chilled water cooling, electric heat, a chiller, a blood-bank monitor, three domestic hot water circulation pumps, temperature monitoring, and glycol heat recovery. Tri-Star Automation was able to help Teulon-Memorial achieve energy savings through on-demand ventilation and a new economizer. Service requests were reduced by 75 percent.

Authorized Dealer

Market Segment

Health Care

Project Type

Retrofit

Project Date

Jan 2014

Installation Type

HVAC

Protocol

BACnet

Total System Objects

200

Hardware
MACH-ProPoint™ Input/Output3 MACH-ProPoint™ Input/Output
MACH-ProSys™3 MACH-ProSys™
MACH-ProWebSys™1 MACH-ProWebSys™
MACH2™ (Legacy)2 MACH2™ (Legacy)